In stock

Edgelec 100Pcs 5Mm Blue Lights Led Diodes (Blue Lens) Diffused Round Lens 29Mm Long Lead (Dc 3V) 100Pcs Resistors (For Dc 6-12V) Included,Bulb Lamps Light Emitting Diode

0 reviews  
8.92 New Brand:
SKU: WBCARB077X9582D
Model: ?BLAU GRUN-Door Edge GuardsBG
UPC : 611355168781
Only 3 left in stock - Order Now.
Price:
$8.92
Free Shipping

Taxes will be calculated at Checkout.
US Delivery Time: 3-5 Business Days.


Qty:


Edgelec 100Pcs 5Mm Blue Lights Led Diodes (Blue Lens) Diffused Round Lens 29Mm Long Lead (Dc 3V) 100Pcs Resistors (For Dc 6-12V) Included,Bulb Lamps Light Emitting Diode

Low Energy consumption And Low Heat Industrial Standard Size,29mm Long Lead for widely used and convenient for cperation Soldering condition (Manual Soldering):Less Than 3 Seconds With 482AF-527AF Soldering condition (Reflow Soldering):Less Than 5 Seconds With 500AF Storage conditions: Drying Preservation And Keep Away From Fire Or High Temperature get other LED models Please search EDgELEc Diodes

Features of Edgelec 100Pcs 5Mm Blue Lights Led Diodes (Blue Lens) Diffused Round Lens 29Mm Long Lead (Dc 3V) 100Pcs Resistors (For Dc 6-12V) Included,Bulb Lamps Light Emitting Diode

Edgelec 100Pcs 5Mm Blue Lights Led Diodes (Blue Lens) Diffused Round Lens 29Mm Long Lead (Dc 3V) 100Pcs Resistors (For Dc 6-12V) Included,Bulb Lamps Light Emitting Diode

Write a review


Your Name:


Your Email:


Your Review:

Note: HTML is not translated!

Rating: Bad           Good

Enter the code in the box below:




Warning Warning - California Proposition 65

This product may contain chemicals known to the State of California to cause cancer, birth defects, or other reproductive harm.